11.12. Global Setting of Probability

Applies to: @RISK 6.x/7.x, Professional and Industrial Editions

I am using @Risk with Microsoft Project. I want to set distributions on durations for many tasks. I can see how to do it one activity at a time, but I can't figure out how to set them on durations globally. I have very large schedules, and it would take a lot of time to set the duration distributions one at a time. Is there a better way?

Yes—two better ways, in fact.